必威官网西汉姆联

欢迎访问必威官网西汉姆联!

必威官网西汉姆联:必威官网西汉姆联

联系人:李经理

电话:15954121087

移动电话:15153190187

地址:山东省济南市天桥区小清河北路滨河商务中心D座24层2402

当前位置:首页>新闻动态>>常见问题>>必威官网西汉姆联施工准备和施工工艺介绍

必威官网西汉姆联:必威官网西汉姆联施工准备和施工工艺介绍

来源:http://www.jnndjc.com 日期:2022-08-08 发布人:nsadmin
在安装隔断的时候,有很多的技术,和施工要点需要我们掌握,这样才能保证隔断更好的使用,那么下面就来讲讲必威官网西汉姆联施工准备和施工工艺的相关内容吧。
When installing partitions, we need to master a lot of technologies and construction points to ensure better use of partitions. Let's talk about the construction preparation and construction process of toilet partitions.
(一)济南必威官网西汉姆联的施工准备
(1) Construction preparation of toilet partition in Jinan
1、材料及安装工具:
1. Materials and installation tools:
(1)进入现场的隔板样式、数量及加工质量符合设计要求,有出厂合格证。
(1) The type, quantity and processing quality of the partition plate entering the site shall meet the design requirements and have the factory certificate.
(2)五金配件的种类、规格、型号符合图纸要求,并与卫生间隔板相匹配且产品质量合格。
(2) The type, specification and model of hardware fittings shall meet the requirements of the drawings, and shall match with the toilet partition and the product quality shall be qualified.
(3)安装工具:电锤、改锥、电钻、螺丝刀等。
(3) Installation tools: electric hammer, screwdriver, electric drill, screwdriver, etc.
2、作业条件:
2. Operating conditions:
(1)必威官网西汉姆联进入施工现场须检查验收,安装前应先检查型号,尺寸是否符合要求。
(1) The toilet partition shall be inspected and accepted when entering the construction site. Before installation, the model and size shall be checked to see if they meet the requirements.
(2)现场安装队实行队长负责制,由队长负责统筹协调施工期间的事宜。
(2) The on-site installation team implements the team leader responsibility system, and the team leader is responsible for overall coordination of matters during construction.
(3)严格按照施工程序,确保施工质量。
(3) Strictly follow the construction procedures to ensure the construction quality.
(4)注意必威官网西汉姆联门板的开启方向及测量的尺寸,以确保安装时的门的裁口方向。
(4) Pay attention to the opening direction and measured dimension of toilet partition door panel to ensure the cutting direction of the door during installation.
(二)济南必威官网西汉姆联的施工工艺
(2) Construction technology of toilet partition in Jinan
1、工艺流程:现场检查---派线确位---安装标高---配件定位---安装调试---清理打胶---安装验收
1. Process flow: on site inspection --- setting out and positioning --- installation elevation --- positioning of accessories --- installation and commissioning --- cleaning and gluing --- installation and acceptance
济南必威官网西汉姆联
2、施工要点
2. Key points of construction
(1)现场检查:查看图纸复量尺寸,检查图纸与现场是否相符,检查瓷砖,卫生洁具等相关的成品有无损坏之处,特殊工艺的按照甲方和监理确认的施工图施工。
(1) On site inspection: check the size of the drawings, check whether the drawings are consistent with the site, check whether the finished products such as ceramic tiles and sanitary ware are damaged, and carry out the construction according to the construction drawings confirmed by Party A and the supervisor for special processes.
(2)派线确位:标好墙面尺寸,保持水平,垂直、大片应安在两坑正中间(或按现场要求操作)。
(2) Setting out and positioning: mark the wall size, keep it horizontal, vertical and large pieces should be installed in the middle of the two pits (or operate according to the site requirements).
(3)安装标高:根据测量的图纸检查必威官网西汉姆联安装的标高尺寸。
(3) Installation elevation: check the elevation dimension of toilet partition installation according to the measured drawings.
(4)配件定位。
(4) Fitting positioning.
(5)安装调试:调试固定门缝应2至2.5毫米的距离,小腿固定至少两颗螺丝,,门与中小片下端平齐,门的开启轻松自如,回归到位,对隔断门用线进行四边调正,门上下水平垂直,满足施工规范的要求。
(5) Installation and commissioning: the fixed door seam shall be 2 to 2.5 mm apart, and at least two screws shall be fixed on the lower leg. The door shall be flush with the lower end of the small and medium-sized piece. The door can be opened easily and returned to the position. The four sides of the partition door line shall be adjusted, and the door shall be horizontal and vertical to meet the requirements of the construction specification.
(6)清理打胶:打胶时应上下一条线,粗细一样,直角处没有多余的胶,其作用是保证隔板与墙体之间的更加牢固、密封。
(6) Cleaning and gluing: when gluing, the upper and lower lines shall be of the same thickness. There is no excess glue at the right angle. Its function is to ensure that the partition and the wall are more firm and sealed.
安装完毕后指定专人看管,以防其他施工队伍在作业过程中损坏到本产品。要注意,安装完的必威官网西汉姆联我方进行自检,经我方检验合格后报予监理、甲方进行验收。更多相关事项就来咨询我们http://www.jnndjc.com吧。
After installation, special personnel shall be assigned to take care of the product to prevent other construction teams from damaging the product during operation. It should be noted that we will conduct self inspection on the installed toilet partition and submit it to the supervisor and Party A for acceptance after passing our inspection. Please contact us for more information http://www.jnndjc.com Right.
必威官网西汉姆联

必威官网西汉姆联

联系人:李经理

电话:15954121087   移动电话:15153190187

邮箱: 1499873208@qq.com

地址:山东省济南市天桥区小清河北路滨河商务中心D座24层2402

济南无障碍扶手哪家好?供应订做多少钱?济南临边防护栏怎么样?诚信公司专业以批发价格大量现货提供济南防护扶手、做必威官网西汉姆联、无障碍扶手厂家、必威官网西汉姆联怎么做等品质优良的产品,欢迎来电生产定制!
www.jnndjc.com(复制链接) 必威官网西汉姆联
必威官网西汉姆联(China)股份有限公司