医院工程项目在装置通道防撞扶手的时分,同一阶段常常需求装置其他的配套产品,比如说输液轨:透袅惫旒,那么这些医用天轨 都有些什么特点,装置时又是如何操作的呢?
When the anti-collision handrail is installed in the hospital engineering project, other supporting products of the device are often required at the same stage, such as infusion track and curtain track, so what are the characteristics of these medical sky tracks and how to operate the device?
产品特色
Product features
1、天轨输液轨迹有O型、L型、U型、直型,也可特制各种异型轨迹。
1. There are O-type, L-type, U-type, straight type, and various special-shaped tracks.
2、在运送、装置过程中不变形,运用时滑动顺利,承重安全。
2. No deformation in the process of transportation and installation, smooth sliding during operation and safe bearing.
3、咱们的装置不选用射钉枪等临时唐塞方式,而塑料胀塞加木螺丝。
3. Our device doesn't use the temporary down plug method such as nail gun, but plastic expansion plug plus wood screw.
4、市场上的塑料胀塞太杂,安全性没有保障。咱们自己开模具,制造加厚、材质优秀、耐性好的塑料胀塞。确保了运用安全。
4. The plastic expansion plug on the market is too miscellaneous and the safety is not guaranteed. We open our own mold to make thickened, excellent material and durable plastic expansion plug. Ensure the safety of operation.
装置方法
Installation method
1、首要确定输液天轨的装置方位,一般装置在病床的天花板上。需留意避开灯电扇,手术室装置时应留意避开吊塔和无影灯。
1. It is important to determine the orientation of the infusion track device, which is generally installed on the ceiling of the hospital bed center. It is necessary to pay attention to avoid turning on the light fan, and avoid hanging tower and shadowless light when operating room equipment.
2、丈量所购天轨输液架的轨迹装置孔孔距,用Φ8冲击钻头在天花板上钻出深度大于50毫米的孔,打入Φ8塑料胀大(留意塑料胀大打入后应与天花板平齐)。
2. Measure the hole spacing of the track device of the purchased Skyrail infusion frame, drill a hole with a depth of more than 50 mm on the ceiling with a Φ 8 impact drill, and drive in Φ 8 plastic expansion (pay attention to that the plastic expansion shall be flush with the ceiling after being driven).
3、将滑车装入轨迹内,用M4×10自攻螺钉将塑料封头装置轨迹两端(O型轨无堵头,其接头处应平整对齐,确保滑车能在轨迹内自在滑动)。然后用M4×30平头自攻螺钉将轨迹装置在天花板上。
3. Install the pulley into the track, and use M4 × 10 self tapping screws to both ends of the track of the plastic head device (o-rail has no plug, and its joint shall be flat and aligned to ensure that the pulley can slide freely in the track). Then install the track on the ceiling with M4 × 30 flat head tapping screw.
4、装置完毕后,将吊杆挂在吊车挂钩上,检查其运转及其他功能。
4. After the installation, hang the suspender on the crane hook, and check its operation and other functions.